From: route@monster.com
Sent: Saturday, April 16, 2016 2:06 PM
To: hg@apeironinc.com
Subject: Please review this candidate for: NSN Construction Manager
This resume has been forwarded to
you at the request of Monster User xapeix03
|
|||||||
|
|||||||
|
|
|
||||||
|
||||||
|
John (Addison) Morris 1805 Albany Ave Brooklyn New York
11210 Masterinfini@aol.com.
Cell #(914) 548-4531 Home# 718-377-8718 OBJECTIVE:
To maintain my Position as a Top Certified
Technician by using my Vast Skills set in the Wireless Telecommunications
Industry. To Install, Test, Integrate, Upgrade & to Upkeep Maintenance at
the RBS Cabinets Universal Mobile Telecommunications system (UMTS) and Global
Systems of Mobile Communications (GSM) EMPLOYMENT HISTORY: TSC, T-MOBILE, MA, ME NH, NY 9/14-1/15 LEAD FIELD TECH · Worked on
the L1900, L700, L2100 Projects · Performed
Upgrades to Installed Cabinet · Integrated
DUL · Commissioned
DUG · Terminated
T1 · Powered
Cabinets · Troubleshoot
inconsistencies with site issues · Called
Test GSM and LTE · Performed
COP properly and on time · Overseen
Quality of work · Punch walk
sites. · Attended
daily conference calls and gave daily updates ALCATEL-LUCENT, SPRINT, MA, CT, HI 4/13-8/14 LEAD CONSTRUCTION MANAGER · Manage
General Contractors on the Sprint New Vision Project overseeing 300 site
builds. · Manage on
average 5 crews a week on building a Quality Product for the Customer. · Preformed
Site Survey and Kept Good Communication and Relationships with Land Lords and
Property Managers to obtain Access and to answer any questions or concerns. · Looked
over, Negotiated, and Confirmed Pricing of General Contactors Bids for
Building Sites. · Order
Material for Sites and Confirmed Material was delivered. · Red-Line
CD’s and Confirmed changes to Site Builds. · Uploaded
Necessary information into ALU's FST. · Problem
Solve Site Specific Situations. · Manage
Schedule and Crews to meet deadlines. · Made sure
Site was Built Correctly and to make sure General Contactors was using proper
Safety Equipment and was Practicing OSHA Safety Standards at Work Location. · Completed
all Training in Safety Courses. · Organized
and Updated Tracker for Schedule Construction Start and Construction
Completions. · Participated
in Conference Calls with the Customer and Project manager to give updates on
Site Builds and help Solve Problems. · Proficient
in Excel WAVSYS/NSN, T-MOBILE, FL, VA 11/12-4/13 TIGER TEAM, LEAD FIELD INTEGRATOR · Discussed
Quality and Alarm Issues on War Room Bridge · Help
Deploy Proper Civil Team and Field Tech to Site Based According to Schedule · Trouble
Shoot and Fixed various Cell Site Issues · Removed
and Replaced System Modules (ESMB/C and FSME) · Commissioned
System Modules (ESMB/C and FSME) · Replaced
and Commissioned Radio Modules (FXFB) · Cleaned or
Replaced Fiber Jumpers, RF Jumpers, Antennas and RET's · Trouble
Shoot and Fixed Various Alarms at Cell Site WNG, T-MOBILE, NY/NJ 8/12-10/12 LEAD FIELD TECH, on T-MOBILE MODERIZATION PROJECT · Preformed
Power Upgrades on Ericsson 3106 to a 6131 · Commissioned
7705 and LMU into new 6102/6131 Cabinet · Integrated
and Commissioned DUG and DUW in 6102/6131 NEXTLINK, METRO PCS, MA 5/12-7/12 INSTALLATION, INTEGRATION, COMMISSION TECHICIAN · Installed
6102 LTE Cabinet · Secured
Cabinet to Either Concrete Slab or Steel Dunage WAVSYS, T-MOBILE, NY, NJ, PA, MA, RI, NH 9/11-5/12 INSTALLATION, INTEGRATION, COMMISSION TECHICIAN · Managed MA
Warehouse work on a Scheduling and Equipment Allotment Policy for Different
Crews · Created
P.O for new Supplies to be delivered to warehouse. · Kept
diligent records of import and export of Equipment via Spreadsheets. · Installed
Integration of DUW30 in Ericsson 3106,6102 · Call NOC
for Check in · Call NIC
to Shut Down Site · Install
Power and Connect Cables to DUW30 and XCU · Use
HyperTerminal to Scratch/load DUW D and C Drives · Set the IP
Address and Sub Mask · Open FTP
(WSFTP) Commission DUW30 to Upload Basic Package and Upgrade Package · Use
HyperTerminal to set Clock and Read Clock and Reload · Used
Element Manager (EMAS) and get Screen Shots Equipment, Alarm List and CV
Files and UP’s · Use EMAS
to Configure Cabinet · Set IP to
DUW30 IP address (169.254.1.1).set user “rbs”. set password “rbs” · Used EMAS
to Upload Scripts · Created CV
Files from Element Manager · Call Test
after NIC Run Baseline · Installed
7705 Router · Powered
7705 Router · Connected
Patch Cables to NID · Ran and
Connected LMU Cable from 2G Cabinet to 3G Cabinet · Commissioned
7705 Router · Used
Provisioning tool to Upload Script to 7705 Router · Captured
Successfully Uploaded Script File · Testing
7705 Router · Called
T-Mobile Prime Team Bridge to Verify Pre-Check · Trouble
Shooting any Cabling or Script Issues to get Pre-Check to Pass · Integration
7705 Router · Performed
Night or Day Cuts to Transfer T1 to 7705 Router · Called
T-Mobile Bridge to Shut Down 2G Cabinet · Prepped T1
to get Ready to Accept 7705 Router · Connected
All T1’s from Either Nortel or Ericsson 2G Cabinet to 7705 · Verified
if Cross Connects was Establish with the Bridge and Specific Site if they was
able to Talk to One another · Had
T-Mobile Switch Bring 2G Cabinet back Up to Start Taking Traffic BECHTEL, AT&T, NY 3/09 TO 9/11 INSTALLATION, INTEGRATION, TESTER FIELD TECHICIAN · Performed
ALU SIAD Installation, Integration · Installed
ALU SIAD (Put on Extension Brackets, Mounted SIAD on Either a Telco Rack or
inside a TE- · Grounded
ALU SIAD (Crimped Lugs and Terminated Grounding Cable to MGB and SIAD) · Terminated
Power for ALU SIAD (Crimped Lugs and Terminated Power Leads to Argus TE-21,
Galaxy, Delta and Argus Indoor Power Plants) · Removed
Compact Flash Card, Deleted Old and Replaced with New Software Version.
Reinstalled Flash Card · Prep’d
Primary and Secondary Ethernet BTS Cables (Tested and Terminated BTS Cables
to SIAD and Ethernet Kit inside UMTS Cabinet) · Pulled and
Terminated Fiber Jumpers at Canoga Perkins and SIAD · Upload
Config File for ALU SIAD · Use
Current Version of ACAT to Upload Config File · Used
HyperTerminal to Ping IP Address after Uploading Config File · Called PCO
to Ping SIAD and Node B · Captured
Text File for Site · Performed
Night / Hot Cut Over for DS3, Tellab Ethernet, ALU 7705 SIAD · Called RIC
and RITC to Shut Down the Site (Nokia GSM and Lucent UMTS Cabinet) · Moved the
GSM T1 Timing Cables to the Tellab SIAD. · Called RIC
and RITC to Bring the Site Back Online and Checked for Cabinets Taking
Traffic and any New Alarms. · Performed
G2 Test on T1 · Performed
T1 Testing with T-Berd 2209 ( on All Ones, 1-7, QRSS, All Zero Test Patterns) · Terminated
T1’s at NIU with RJ45 · Installed
Bisket Jacks. · Punched
Down T1’s to 66 Block and 110 Block · Punched
Down Riser Cable 25pair to 66 Block · Installed
Surge Arrestors · Looped Up
CSU at Lucent UMTS Cabinet Through Switch and Test Set · Performed
MOP at AT&T Sites · Performed
A Rip And Replace · Removed
all Pre-existing Cat5e Cable from DMarc to Telco Box. · Replaced
Cat5e Cable with 25 Pair Riser Cable · Installed
66 Block and Punched Down 25 Pair. · Terminated
Pre-existing Circuits to 66 Block Leading back to DMarc · Perform
SIAD Installs and Configurations. · Mounted
SIAD on Telco Rack or inside TE-21 Cabinet · Terminated
Power and Grounded SIAD. · Uploaded
Config Files through Hyper Terminal. · Removed
Secondary Power ,Set Clock and Ping SIAD · Perform
9-14 SIAD Preps · Terminated
T1’s to SIAD ports 0-14 · Terminated
DS3 Cables BNC Connectors and SMB Connectors. · Looped up
Ports 0-14 on SIAD. · Performed
Ethernet Preps and Testing · Terminated
DS3 Cables BNC, SMB Connectors. · Installed
Fiber Jumpers to Canoga Perkins Ethernet and SIAD · Uploaded
Config File for SIAD through ACAT · Terminated
BTS Cross Over Cable and GSM Timing Cables for SIAD. · Performed
DS3 Prep and Testing. · Performed
DS3 2^23-1 Test Pattern for 1 hour. To Verify Good Connections and Signal. · Terminated
DS3 Cables BNC, SMB Connectors. · Uploaded
Config Files through Hyper Terminal. · Removed
Secondary Power ,Set Clock and Ping SIAD · Terminated
GSM Timing Cable. AMTEL, ATT, OK 9/08-3/09 INSTALLATION&INTEGRATION FIELD TECHNICIAN l 2ND Carrier Install 850 and 1900 RU, FU and PSU l Performed
Call Test (E911, Phase 1&2, Sector
verification, Download & Upload speed HSDPA) l Configuration
and Integration of the 3106,3206,3418,3518 l Installed
RF Jumpers l Color Coded According to ATT Code Standards l Added Connectors to Jumpers l Performed Line Sweeps Using Anritsu l Connected Jumpers to Diplexers l Pulled,
Terminated and Tested T1's l Pulled T1’s Through Conduit. l Terminated T1’s at the NIU, Surge Arrestor and
Equipment l Tested
with T-BERD (QRSS,ALL ONES,ALL ZERO TEST
PATTERENS) l Installed Surge Arrestor and Grounded to MGB l Laced T1's and RF Jumpers on Ladder Rack l 2106 BBU Install l Drilled and Secured BBU, Installed Batteries +24v
and DC Filter l 2106 Installation l Secured 2106 to BBU and Powered up Cabinet l Grounded BBU and 2106 l Completed an EUPEN Training Course l Performed QA and LMC to get site ready for
Integration and Operation WNG(WIRELESS
NET WORK GROUP) T-MOBILE, MD 11/07-6/08 INSTALLATION
FIELD TECHNICIAN l Installed Ericsson Node B UMTS 3106,3206,3518,3418. l Performed 3418 to 3018min/max conversions l Set Powered configuration for UMTS
3106,3206,3518,3418. l Ran and Installed RF Jumpers from hard lines to NODE
B l Installed batteries and Power termination for
all Node B cabs l Responsible for Cat 5e (T1's)run from DMARC to
Node B l Tested and installed dual pull breakers for Node B l Terminated T1 to the NIU by way of the OVP board l De Installed Ericsson GSM 2106 cabs l Built H Frames for the 3518 l QA, Tested (Line Sweeps (Return loss and Distant to
fault) on RF Lines with the Anritsu Site Master. l Installed and powered PBC 6500 for 3206 l TEK SYSTEMS
T-MOBILE, NY 03/07-09/07 INSTALLATION
FIELD TECHNICIAN l Worked with Nortel's 1200, 1800, 8000. l De Installed EDGE Radios and PA's. l De Installed RM's. l Installed
Axxius 800 CSU. To replace Kentrox Units l Upgraded Axxius 800 CSU. With new scripts l Trouble Shoot T1 Connect and Disconnect. CERTIFICATIONS AND SKILLS l Certified Ericsson Installer and Integrator. l Certified Nokia Installer and Integrator. l Full
Knowledge of Anritsu and T-BERD testing Equipment l Pulling T1, RF Cable and Fiber optics. l Termination- Complete IDC terminations, connected RF
cable cross-connect blocks and patch panels. EDUCATION Online
Courses
10/08 Completed the CPR and OSHA 10 hour Course Received Certification in CPR and OSHA training New York City College of Technology, Brooklyn, NY3/02 – 3/03 Department of Adult and Continuing Education Telecommunications Network systems Installation -- BICSI
Certified Level I Installer Technical Career Institutes, New York, NY9/01 – 3/02 Studied Computer Science, Network
Administration and RF Theories Peninsula Builder Housing Association, Newport News, VA1998 Certification received in Construction |
|
|
||||||||
|
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
Languages: |
Languages |
Proficiency Level |
|
English |
Fluent |
|
|
|